Serial Number |
Product Name |
Appearance |
Solid Portion Over120 3hr |
Viscosity (Tu-1 cup 25°C) |
Adhesion (Paint film meter) |
Dry (Finger-touch) |
Characterization |
Main component |
JY-3200 |
PU sealing primer |
Light white liquid |
60±5% |
20+2KU |
≥95% |
≥20min |
Easy to sand, good hardness |
Saturated polyurethane resins |
JY-3210 |
PU second degree primer |
Light white liquid |
60±5% |
50+2KU |
≥95% |
≥20min |
Easy to sand, good hardness |
|
JY-3220 |
PU second degree primer |
Light white liquid |
60±5% |
55+2KU |
≥95% |
≥20min |
Easy to sand, good hardness |
1: The main agent should be used with the corresponding hardener, the ratio is 2:1, the construction viscosity is recommended to be 15~18 seconds, the user can be adjusted according to the specific situation.
2: The construction environment should be above 15℃ to ensure the reactivity of the main agent and hardener.
3: To be applied to the film after drying sanding can be re-coated or finger touch does not stain the hands without sanding can be re-coated several times in a row. Sanding after drying.
Sanding of stock (Quercus, Ash) <Filler (material with large pores) Dry and sand 、PU headiness (pine, teak and other greasy woods)>240# sandpaper
PU 2nd degree primer (until filled) dry sanding PU topcoat (or PE, NC topcoat) dry wrapping;
1: The board should avoid pollution and the water content should not be higher than 12%.
2: After mixing the main agent and hardener, continue to use up in the available time, spraying equipment timely wash.
3:This information is set under the condition of our company, only for reference.